Ashuri, B and Tavakolan, M (2012) Fuzzy Enabled Hybrid Genetic Algorithm–Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning. Journal of Construction Engineering and Management, 138(09), 1065–74.

Choi, K, Son, K, Woods, P and Park, Y J (2012) LEED Public Transportation Accessibility and Its Economic Implications. Journal of Construction Engineering and Management, 138(09), 1095–102.

Dikmen, I, Birgonul, M T, Tah, J H M and Ozer, A H (2012) Web-Based Risk Assessment Tool Using Integrated Duration–Cost Influence Network Model. Journal of Construction Engineering and Management, 138(09), 1023–34.

Fong, P S W and Chen, L (2012) Governance of Learning Mechanisms: Evidence from Construction Firms. Journal of Construction Engineering and Management, 138(09), 1053–64.

Gilkey, D P, del Puerto, C L, Keefe, T, Bigelow, P, Herron, R, Rosecrance, J and Chen, P (2012) Comparative Analysis of Safety Culture Perceptions among HomeSafe Managers and Workers in Residential Construction. Journal of Construction Engineering and Management, 138(09), 1044–52.

Hajifathalian, K, Wambeke, B W, Liu, M and Hsiang, S M (2012) Effects of Production Control Strategy and Duration Variance on Productivity and Work in Process: Simulation-Based Investigation. Journal of Construction Engineering and Management, 138(09), 1035–43.

Liu, D, Sun, J, Zhong, D and Song, L (2012) Compaction Quality Control of Earth-Rock Dam Construction Using Real-Time Field Operation Data. Journal of Construction Engineering and Management, 138(09), 1085–94.

  • Type: Journal Article
  • Keywords: Earth-fill dams; Construction; Soil compaction; Quality control; Estimation; Monitoring; Earth-rock dam construction; Compaction; Quality control; Compactness estimation; Multiple regression model; Kriging interpolation; Real-time monitoring;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000510
  • Abstract:
    Compaction quality is critical to the stability and durability of earth-rock dams. The traditional quality inspection method relies primarily on testing randomly sampled spots of a job site, which may cause unreliable representation of the compaction quality of the entire work and lead to delays not only in performing the construction work but also in identifying and rectifying quality issues. In this paper, a quality-inspection process is developed that monitors compaction operations of earth-rock dam construction in real time and establishes a multiple regression model to predict compaction quality by using independent variable data obtained from the real-time quality-monitoring system. These independent variables include compaction operation parameters (i.e., compaction passes, roller velocity, vibration status, and pavement thickness) and earth-rock aggregate’s moisture content and gradation. Furthermore, by using the kriging interpolation procedure, the compactness at any point of a work area can be estimated, and the overall passing rate and spatial uniformity of compaction quality of the work area can be analyzed. The case study of the NZD Dam project in southwest China demonstrates the effectiveness and feasibility of the proposed method. This method enables the evaluation of compaction quality covering 100% of the work area, thus reducing the uncertainty of quality inspection associated with random spot tests, and facilitates timely feedback for quality control and improvement of earth-rock dam construction.

Moret, Y and Einstein, H H (2012) Experience in Expert Estimation of Probabilities and Correlations for Rail Line Construction. Journal of Construction Engineering and Management, 138(09), 1103–6.

Moret, Y and Einstein, H H (2012) Modeling Correlations in Rail Line Construction. Journal of Construction Engineering and Management, 138(09), 1075–84.

Shewchuk, J P and Guo, C (2012) Panel Stacking, Panel Sequencing, and Stack Locating in Residential Construction: Lean Approach. Journal of Construction Engineering and Management, 138(09), 1006–16.

Son, K, Choi, K, Woods, P and Park, Y J (2012) Urban Sustainability Predictive Model Using GIS: Appraised Land Value versus LEED Sustainable Site Credits. Journal of Construction Engineering and Management, 138(09), 1107–12.

Xia, B, Chan, A, Molenaar, K and Skitmore, M (2012) Determining the Appropriate Proportion of Owner-Provided Design in Design-Build Contracts: Content Analysis Approach. Journal of Construction Engineering and Management, 138(09), 1017–22.